Power management and generator control systems
TBC engineers the control authority and sequences between mains supplies, generators, switchgear, metering, PV, BESS and third-party controllers so the complete electrical system behaves predictably in normal and failure conditions.
Operating scenarios we define before testing
The important part of a power-management design is agreeing exactly what happens as sources become available or unavailable, breakers change state and the site moves between normal, standby and degraded operation.
- Mains healthy, mains failure and automatic generator demand
- Generator available, transfer, synchronising and bus-coupler operation
- Load shedding and staged restoration against available capacity
- Failed starts, unavailable sources, breaker failures and recovery behaviour
PV and BESS coordinated with standby generation
Renewable and stored-energy systems introduce additional sources, export limits, control authority and failure scenarios. TBC coordinates these interfaces with the wider power-management philosophy.
- Solar PV integration with mains and standby generation
- BESS charging, discharging and availability interfaces
- Generator and BESS interaction
- Metering, power monitoring and third-party controller interfaces
Failure scenarios proved before energisation
Power-management FAT and site testing prove source changes, breaker commands and feedback, synchronising, load response and abnormal conditions as a complete operating system rather than as separate devices.
- Software simulation and staged FAT
- Generator, mains and breaker sequence testing
- Load shedding and restoration proving
- SAT, integrated systems testing and site commissioning
Power management is a coordination problem before it becomes a PLC problem.
Switchgear, generator controllers, metering, PV, BESS and site loads all have their own states and limitations. TBC defines the control authority and interfaces between them before those rules are implemented and tested.
Have a generator, switchgear or load-management sequence to define?
Share the SLD, protection or generator information and the required operating philosophy and TBC can define the controls, interfaces and testing scope.