Relevant experience across process, controls, power and electrical integration.
Experience includes petrochemical tank storage, process controls, PLC and SCADA delivery, power-management systems, switchgear controls, functional documentation, FAT, SAT and commissioning on complex UK projects.
Process & COMAHOperational tank terminal
Petrochemical tank-storage control modifications
Controls engineering for brownfield changes involving tank-farm equipment, pump and valve sequences, process instrumentation, shutdown interfaces and controlled implementation on a live operational site.
Definition and coordination of process permissives, trips, alarms, packaged-equipment interfaces and shutdown actions where responsibilities must remain clear across control, electrical and safety-related systems.
Project details are shared with the right level of confidentiality.
Client names, site details and performance claims are only published where permission and confidentiality requirements allow. Relevant comparable experience can be discussed directly against a live enquiry.
Next stepShare the project context and current information.
TBC can explain the most relevant experience, the proposed approach and what would be needed to deliver the scope.