System overview
SITE LOAD928 kW
UTILITY IMPORT928 kW
GENERATOR0 kW
BESS0 kW
BATTERY SOC80.0 %
Normal operation
Each mains supply feeds its normal distribution. Life Safety is supplied, the generator is on standby and the battery is available for support.
SYSTEM SINGLE-LINE
Select a breaker or switchboardSequence details & scenario explanation
SEQUENCE MONITOR
IDLENormal operation
— / —
No automatic switching in progress
- Step elapsed
- 0.0 s
- Overall elapsed
- 0.0 s
- Transition
- Await a plant condition
Start conditions / run permissives
START CONDITIONS (captured)
Await sequence triggerNO
RUN PERMISSIVES (live)
EPO not activeYES
System in AUTOYES
No device operation faultYES
Target source healthyYES
Backbone communications and availability healthyYES
Backbone devices in AUTOYES
No prohibited electrical parallelYES
Explore the electrical system
WHAT HAPPENED
Both utilities are healthy.
WHAT THE PMS IS DOING
Each mains supply feeds its normal distribution. Life Safety is supplied, the generator is on standby and the battery is available for support.
WHY
Keep the normal supplies separate and standby resources ready for a loss of mains.