Industrial control systems integration
Thomas Brown Controls provides industrial control systems integration, coordinating PLC, SCADA/HMI and electrical-control interfaces with switchgear, power-management functions, industrial networks and third-party equipment.
One working system, not a collection of separate interfaces.
A control system can contain equipment from several manufacturers and engineering disciplines. TBC defines how those parts exchange status, commands, permissives, alarms and control authority so the complete system can be developed and tested against an agreed operating philosophy.
- PLC, HMI and SCADA applications
- Electrical-control interfaces to switchgear, protection and metering
- Generator and ATS controllers, drives, remote I/O and instrumentation interfaces
- Packaged plant, OEM controllers and other third-party systems
Software and networks coordinated around the same equipment states.
PLC logic and operator interfaces are developed around defined equipment behaviour rather than separate tag lists. Communications are treated as functional interfaces, including what data is exchanged and what the system must do when that exchange is unavailable.
- PLC logic, operating modes, sequences, interlocks and permissives
- SCADA/HMI commands, alarms, trends, diagnostics and control status
- Modbus TCP/RTU, Profinet, EtherNet/IP and OPC UA where required
- Remote I/O, industrial Ethernet and packaged-equipment interfaces
Switchgear control and power management under defined operating authority.
Electrical control systems often span PLCs, breakers, protection relays, meters, generator controllers and other intelligent devices. TBC coordinates those interfaces so source selection, switching and power-management functions behave consistently from field equipment through to SCADA.
- Circuit-breaker status, commands, interlocks and electrical permissives
- Protection relays, power meters and generator-controller interfaces
- ATS, synchronising, source transitions and restoration sequences
- Load management, load shedding, PV and BESS integration where required
Integration carried from functional requirement through commissioning.
Existing plants rarely offer a clean interface boundary. TBC can establish the installed condition, define what must change and manage the integration through design, software modification, testing and final handover.
- Existing PLC and SCADA applications, legacy equipment and undocumented interfaces
- Controlled modification, migration and recovery of legacy interfaces
- FAT and SAT based on complete operating and failure scenarios
- Commissioning, defect closeout and revision-controlled handover
Systems integration ties the specialist disciplines together.
TBC can lead the systems-integration scope or support a defined part of it, coordinating responsibilities across PLC, SCADA/HMI, electrical controls, power management and testing.
Need several control-system interfaces brought together?
Send the available specification, drawings, software information or interface schedule and TBC can define the integration boundary, responsibilities and practical route to delivery.