Electrical and control-system engineering
TBC produces the functional and electrical-control information needed to manufacture, install, program, test and modify a control system without relying on undocumented assumptions.
Requirements written so they can be engineered and tested
The design starts by defining what the system must do, how equipment interacts and what acceptance criteria will prove the intended operation.
- Control philosophies and Functional Design Specifications (FDS)
- Cause-and-effect matrices and operating narratives
- PLC and SCADA architecture
- Interface and communications schedules
A design package ready for manufacture and installation
The electrical-control package needs enough detail for panel build, field installation, PLC configuration and testing without forcing each discipline to fill gaps with its own assumptions.
- Control schematics, functional diagrams and panel information
- I/O, terminal, cable and equipment schedules
- Power supplies, protection, segregation and control interfaces
- BOM and manufacturing information where required by the project
Design information that remains usable through delivery
Changes made during manufacture, testing or commissioning need to close back into the final controlled design pack.
- Consistent equipment and signal naming
- Revision-controlled issue and change records
- Design reviews against vendor and client information
- As-built updates following FAT and commissioning
Drawings, I/O and software need to describe the same system.
Electrical-control design sits between the functional requirement, the panel or field installation and the final software. Keeping those references aligned reduces late interface changes and gives testing a reliable design baseline.
Need the controls package taken through detailed electrical design?
Send the available specification, SLDs, functional information or existing drawings and TBC can define the design package needed for manufacture and site delivery.